Commercial Projects

Milkboy Recording Studio

3500 sq. ft. recording studio in downtown Ardmore was a challenge due to existing conditions. It is a sought after studio due to excellent acoustics and aesthetics.

press to zoom
press to zoom
press to zoom
press to zoom
1/1

Blaze Salon

Once an old vacuum repair shop and warehouse, the client was looking for an interior reflective of the town but appealing to a mixed client base.

press to zoom
press to zoom
press to zoom
1/1

Smith Medical Building

press to zoom
press to zoom
1/1

15000 sq ft. new office building geared towards the needs of the medical profession in location, suite size, and equipment requirements.

YSC Youth Sports Center, Malvern

The new center tripled in size the existing indoor/outdoor soccer facility. The 55,000 square foot facility is a world-class training center and would have served as a training facility had Philadelphia won the 2018 World Cup Soccer bid.

press to zoom
press to zoom
press to zoom
1/1